Cold Store Specialist ISD Solutions Completes 150th Installation for Morrisons
Published on 21st May, 2015
Gloucester, 19 May 2015: ISD Solutions, a leader in composite panel cold store construction, has completed its 150th cold store for Morrisons supermarkets at the M local store on Barnwood Road in Gloucester.
Under the contract, ISD Solutions’ Retail division provides complete design, manufacture and installation services for each cold storage facility and in Gloucester, installed a dual temperature storage compartment measuring 6.00m by 3.35m that provides walk-in food storage for temperature sensitive produce with sufficient storage capacity between deliveries.
Colin Coe, Head of Refrigeration at Morrisons said: “ Ensuring that we have the right cold storage facilities in place is crucial. ISD Solutions has easily fulfilled our requirements and helped us to do just that.”
Each cold store is designed to provide thermally efficient, food-safe storage with temperatures down to minus 20 degrees, with easy clean finishes. The rooms are manufactured from 80mm and 100mm PIR rigid thermal insulation panels with 2 hinged doors manufactured in-house.
Andrew Hudspith for ISD Solutions said: “Fast installation, often within a two-day time-frame to accommodate other key contractors has been a key factor. Also, the ability to provide design, manufacturing and installation on multiple simultaneous projects, built to International Association for Cold Storage Construction standards, together with our large-scale experience on projects such as the Morrisons distribution centre in Bridgewater, have all been important factors.”
We are experts in cold storage construction, firewalls, data-centres and single envelope cladding.
Brochures
We’ve put together some brochures to help you decide on the right company to choose for your next project.